Chicago's 100 percent renewable electricity milestone

In January 2025 the city reported its buildings and operations run on 100 percent renewable electricity; what the deal is, what it covers and what it does not.

On January 3, 2025, the City of Chicago announced that it had hit a goal it had chased for years: every facility and operation it runs was now powered by 100 percent renewable electricity. The announcement came from the mayor, the Department of Environment and the Department of Fleet and Facility Management, and it reached from the airports to the Harold Washington Library Center. The milestone is real. But "100 percent renewable" can mean several different things, so how the city got there is worth a closer look.

What the city announced

The facts of the announcement, as the city described them:

  • As of January 1, 2025, all City-owned buildings and operations, including O'Hare and Midway airports and the Harold Washington Library Center, were supplied with 100 percent renewable electricity.
  • The supply comes under an energy supply agreement with Constellation, an energy company.
  • Seventy percent of the renewable energy comes from a new solar installation called Double Black Diamond, a 593-megawatt project developed by Swift Current Energy in Sangamon and Morgan counties in downstate Illinois.
  • The other thirty percent is covered by renewable energy credits, which are purchased certificates.
  • The city's own release puts its annual electricity use at roughly 800,000 megawatt hours. Other accounts gave a somewhat higher figure, so the exact amount depends on the year and how it is counted.
  • The transition was expected to cut Chicago's carbon emissions by about 290,000 metric tons a year.
  • The effort followed a long advocacy campaign, Ready for 100, led by the Sierra Club and community organizations, and involved partners including Elevate, Constellation and Swift Current Energy.
  • The city's longer-term aim is for all the energy used across Chicago, not only in city buildings, to be renewable by 2035.

Some press coverage at the time described Chicago as the largest U.S. city to power all of its municipal buildings with renewable energy.

Doing the math

The city's 70-30 split turns into numbers easily. If the city uses about 800,000 megawatt hours in a year:

  • Seventy percent is 560,000 megawatt hours, supplied from the Double Black Diamond solar project.
  • Thirty percent is 240,000 megawatt hours, covered by renewable energy credits.

The projected reduction of 290,000 metric tons of carbon dioxide a year, divided by 800,000 megawatt hours, implies roughly 0.36 metric tons avoided per megawatt hour. That is a ratio, not a measurement, and it depends on what the electricity would otherwise have come from. The point is to give a feel for how the claimed climate benefit relates to the scale of the city's electricity use.

And keep the scale straight. 800,000 megawatt hours is what the city's own buildings and operations use. It is a small fraction of the electricity the whole city consumes. Residents and private businesses buy their own power, which comes up below.

What a renewable energy credit is

The 30 percent that comes from credits is the part of the deal that needs explaining. A renewable energy credit, often shortened to REC, is a certificate representing one megawatt hour of electricity generated from a renewable source such as wind or solar. A buyer who purchases a REC can claim the environmental attributes of that generation, even though the physical electrons it uses come off the shared grid, where all power is mixed together.

There are two views of RECs, and both are worth knowing.

  • Supporters say credits are an accepted and flexible way to match consumption with renewable generation, that they send revenue to renewable projects and that the cost is lower than building new generation for every purchaser.
  • Critics argue that credits can overstate the benefit, because buying a certificate from an existing project does not necessarily add new generation to the grid, and that purchases tied to new projects are stronger. That is why the 70 percent from a newly built solar project is the part advocates tend to lead with.

The city's structure, mostly from a new project and a portion from credits, is a common hybrid. Which view you find more persuasive depends on what you want the purchase to accomplish, and the city's release lays out the structure so readers can judge.

What it covers, and what it does not

The milestone is about electricity bought for city-owned facilities and operations. That is a defined set: buildings, airports, libraries and other facilities, run by the city. It does not mean all energy use in Chicago is renewable, and it does not mean every light in the city comes from a solar panel. Several things sit outside it:

  • Heating fuel. Many buildings heat with natural gas, which is separate from electricity.
  • Vehicle fuel. The city's fleet runs on fuels the electricity agreement does not address.
  • Residents and businesses. Households and companies buy power on their own accounts. How they do it, and the choices available, are in Setting up electricity, gas and water in Chicago.
  • Delivery. The electricity still arrives over the local utility's wires. The supply contract determines where the power is bought, while the delivery system stays the same.

That last point is why the arrangement works the way it does. In Illinois, a customer can choose its electricity supplier while the local utility keeps delivering it. For the city, the supplier is Constellation, and the physical connection to its buildings is unchanged.

Why it matters, and the questions it raises

The milestone matters for a few reasons. It is a large purchase of new solar generation in Illinois. It puts the city's own operations in line with the climate commitments the city has made. And it gives a city that has argued for clean energy a credential when it sits across from other governments and businesses. The Department of Environment is the agency that leads the city's work on climate, the cumulative-impact ordinance and renewable energy.

It also raises questions residents reasonably ask:

  1. What did it cost? The city's release describes the structure of the supply agreement. A resident who wants the financial detail can look in the city's budget documents and contract records; see Budget and Finance for where the budget lives.
  2. How much is new generation? The 70 percent from a newly built project is the figure the city points to. The share from credits is a different kind of purchase.
  3. What about the rest of the city? The 2035 goal for all energy consumed in Chicago covers households, businesses and transportation, and it is a much bigger job than the city's own buildings.
  4. What happens when the contract ends? Supply agreements have terms, and the city will have to renew or replace them.

None of these questions takes away from the achievement, and all of them are ordinary parts of how a public purchase gets judged.

Scale in megawatts

Megawatt hours measure energy used over time; megawatts measure the rate at any moment. Divide the city's 800,000 megawatt hours by the 8,760 hours in a year and you get an average load of about 91 megawatts, meaning that on average the city's buildings and operations draw about as much power as a 91-megawatt generator would produce running nonstop. The Double Black Diamond project is rated at 593 megawatts, but a solar plant produces at full rating only in bright sun, and its annual output is a fraction of rating multiplied by every hour of the year, so the two numbers cannot be compared directly. What the contract does is match a year's worth of purchases with a year's worth of generation and credits, not every hour of the day.

That distinction, annual matching versus hour-by-hour matching, is one of the questions energy analysts ask about any "100 percent" claim. At noon on a sunny day, the city's buildings are drawing power solar can supply. At night in January, they draw from the grid's mix of sources. The annual accounting is a legitimate and widely used standard, and it is also a limited one, which is why some advocates push for matching more closely to the hours of use.

How to read a clean-energy claim

The city's announcement is a good case for learning to read any such claim. Four questions help:

  1. What is covered? Electricity for city-owned facilities and operations, not all energy used in the city.
  2. Over what period? An annual total, not each hour.
  3. How much is new? Seventy percent from a newly built solar project, thirty percent from credits.
  4. What is the target after this? All energy consumed in Chicago renewable by 2035, a much wider goal.

A claim that answers all four is worth more than a slogan, and the city's release did answer them. For the broader environmental picture, residents can look at the city's other environmental work, such as the tree program in the city in a garden: trees, forestry and the motto and the air-quality alerts described in wildfire smoke days and air quality alerts.

Where you can see it

The buildings covered by the agreement are places residents use. City Hall at 121 North LaSalle describes the seat of government. The airports, O'Hare: from a C-54 factory airfield to a global hub and Midway Airport: Chicago's first big airport, are run by the Department of Aviation (see Chicago Department of Aviation), and the Harold Washington Library Center, the central library, is described in The Harold Washington Library Center at 400 South State and Chicago Public Library. Each draws its electricity under the agreement.

For a household, the analogue is the choice of supply on the electric bill, and for the region, the question of how electricity demand grows; one source of new demand is the data center industry, discussed in the cloud tax: how the lease transaction tax reaches software. The city's announcement is a reminder that where power comes from is a decision as well as a utility bill, and that decisions can be changed.